Verified supplier

Verified supplier

Supplier Location:

Denver, CO

Member Since:

2023

Rating
5.00
(1 review)

Watson Gloves Flextime Impact w/Cut Large Dryhide Water Resist

In stock
0.00
(0 reviews) Write a review
WG005TPCL
10 days
$26662

Minimum quantity for "Watson Gloves Flextime Impact w/Cut Large Dryhide Water Resist" is 1.

Request Bulk Order Quote Chat Now
Dryhide™ water-resistant full-grain goatskin leather palm is hard-wearing and durable while providing great dexterity. The CutShield™ P-aramid/steel/polyester liner with ANSI cut level A5 resistance offers superior protection. Heavy-duty rubber on back of hand, fingers and knuckle bar provides impact protection. Hooded fingertips and thumb for added reinforcement and protection in critical wear areas. The spandex stretch back is flexible and provides form-fitting memory. Touchscreen compatible fingertips can be used on all touch screen devices. Snug-fitting elastic wrist and secure Velcro® closure keep out dirt and debris.

Tell us what you need

Reviews

Average Star Rating:
0.00 (0 reviews Total)
  • 5 stars
    0
  • 4 stars
    0
  • 3 stars
    0
  • 2 stars
    0
  • 1 star
    0
Have you used the product?
Tell us something about it and help others make the right decision
Show reviews with:
5 stars (0 reviews)
4 stars (0 reviews)
3 stars (0 reviews)
2 stars (0 reviews)
1 star (0 reviews)

No reviews found

Description

Watson Gloves Flextime Impact Work Armor Gloves
with CutShield protection - Large
Dryhide™ water-resistant full-grain goatskin leather palm is hard-wearing and durable while providing great dexterity. The CutShield™ P-aramid/steel/polyester liner with ANSI cut level A5 resistance offers superior protection. Heavy-duty rubber on back of hand, fingers and knuckle bar provides impact protection. Hooded fingertips and thumb for added reinforcement and protection in critical wear areas. The spandex stretch back is flexible and provides form-fitting memory. Touchscreen compatible fingertips can be used on all touch screen devices. Snug-fitting elastic wrist and secure Velcro® closure keep out dirt and debris.